Elk Grove Road Closure/Work Notifications
Week of July 6, 2008 ROAD CLOSURES: E. Stockton Blvd. at Sheldon Rd., from Northbound 99 on-ramp (ramp will be open) to Geneva Point Dr. (No...
https://www.elkgrovenews.net/2008/07/elk-grove-road-closurework.html
Week of July 6, 2008
ROAD CLOSURES:
E. Stockton Blvd. at Sheldon Rd., from Northbound 99 on-ramp (ramp will be open) to Geneva Point Dr. (North and south bound) June 2, 2008 to August 1st 2008
W. Stockton Blvd. – From Promenade Parkway to Grant Line Rd.
July 8th – Permanent Closure & Abandonment
LANE CLOSURES:
Grant Line Road (North of 99)
(North bound) June 30th – July 4th 8:30 am – 3:30 pm
Elk Grove Blvd. between Laguna Springs Dr. and Big Timber Dr.
(West bound) July 6th – July 18th 9:00 pm – 5:30 am
Bruceville Road between Laguna Blvd. and Di Lusso
(North and south bound) June 15th – July 6th
8:30 am – 3:30 pm (Mon. thru Thurs.), 8:30 am to 12:00 pm (Fri.)
Elk Grove-Florin Road between E. Stockton and Elk Grove Blvd.
(North bound and south bound – alternating) June 30th – November 1st 8:30 am – 4:00 pm
Bilby Rd., east of Bruceville Rd.
(East and west bound) May 19th – July 30th 8:30 am – 3:30 pm
Bradshaw Rd. between Kapalua Ln. and Ridge Rock
(North and south bound – alternating) May 12th – July 12th 8:30 am – 3:30 pm
Bruceville Rd. between Bilby Rd. and Boa Nova Dr.
(North and south bound – alternating) May 12th - July 30th 8:30 am – 3:30 pm
Bruceville Rd. at Bilby Rd.
(North and south bound – alternating) June 23rd – July 13th 8:30 am – 3:30 pm
E. Stockton Blvd. between Hampton Oaks and Calvine Rd.
(South bound – intermittent) April 20th – August 17th 8:30 am – 3:30 pm
W. Stockton Blvd. between Old Poppy Ridge Rd. and Grant Line Rd.
(North and south bound – intermittent) April 7th – July 7th 8:30 am – 3:30 pm
Kent St. between Grove Street and Lark Street
(North and south bound – intermittent) April 27th – July 13th 8:30 am – 3:30 pm
OTHER CONSTRUCTION ZONES (EXPECT DELAYS):
Grant Line Rd. between Waterman Rd and West Stockton Blvd.
(North and South bound) February 5, 2007 - August 31, 2008 8:30 am – 3:00 pm
Sheldon Road between Lewis Stein Rd. and Power Inn Rd.
(East and west bound – intermittent) February 4th – August 31st 8:30 am – 3:00 pm
TRAFFIC SIGNALS:
NONE